
24-hour Economy private-sector-led, New Economy solely govt-led programme - Edem Agbana clarifies
2 mins read
18th January 2024 5:30:00 AM
2 mins readBy: Abigail Ampofo

Ghana Water Company (GWCL) attributes the ongoing water rationing in the Greater Accra region to factors including the Akosombo Dam Spillage. Various parts of Accra, such as Nima, Kotobabi, Awudome, Kasoa, and Kwabenya, have been grappling with water rationing.
During an interview on The Morning Starr with Francis Abban, GWCL's communications manager, Stanley Mantey, explained that the company faced challenges before Christmas but had successfully managed them.
“As for water, everybody knows that we are doing demand management and equitable distribution of the little water we have. For a while now, we are talking about the fact that supply cannot meet demand in Accra. So the only thing we can do is demand so that everybody can get some water.
“After the spillage of the Akosombo dam, we had serious challenges with the Kpong Treatment Plant because the spillage washed a lot of debris, aquatic weeds and all manner of things into our injection areas. Because of the force the pumps use in abstracting the water it attracted all these materials into it thereby almost blocking the entire situation,” Mr. Mantey stated.
He also mentioned that the Weija Operation also had some challenges, “so we have to shut down one pump at Weija so that we can work on it. So Weija is also currently not producing at full capacity. We are working seriously at it so that we can also stabilise the system.”
However, Mr. Mantey extended apologies to the areas affected by the water rationing, clarifying that it has been brought about by various challenges.
2 mins read
20 mins read
2 mins read
2 mins read
3 mins read
2 mins read
2 mins read
3 mins read
2 mins read